Illustrative photo
  1. Home
  2. Services

From land, to water, to operation

Nine integrated services in three groups — land, water and execution — each with an example of work we have completed.

01 · Land

Land reclamation & site preparation

From land survey, preliminary design and the final layout, to mobilising crews and equipment and levelling and preparing land for farming or construction.

Completed work

  • Land survey, reclamation and the project layout for Al-Yaqeen Farm in Ismailia.
  • Site works and landscaping on the SCZONE project, for the General Authority for the Suez Canal Economic Zone (SCZONE).
Land after levelling, ready for the projectOn site
09 · Land

Agricultural infrastructure

Grading internal roads, building workers' rest houses and pivot operators' rooms, and the service facilities needed to run a farm.

Completed work

  • Irrigation wells and site works for the General Authority for the Suez Canal Economic Zone (SCZONE) in Ismailia.
Farmland and internal roads from aboveIllustrative photo
02 · Water

Water mains

Main water transmission and distribution lines for farming projects: trenching, laying, backfilling and testing.

Completed work

  • Main feed lines dug and installed for the Kenana, Al-Islah, Agrina, Solaf and Al-Bustan farms in Ismailia.
Network pipes in the trench before backfillingOn site
03 · Water

Irrigation networks

Field irrigation networks connected to their water sources.

Completed work

  • Drip network laid and soil conditioned for Al-Yaqeen Farm.
  • Complete drip irrigation networks, including pipes and main lines, for the Agrina, Zahret Sinai and United Farms projects.
A pipe network inside a trench before backfillingOn site
04 · Water

Pumping & lifting stations

Building and installing pumping stations, pumps and their equipment, then testing and commissioning them.

Completed work

  • A floating irrigation station for New Valley Governorate.
  • Pumps and lifting stations supplied to run the center pivots on the Kenana and Al-Islah farms.
  • Irrigation wells drilled for the SCZONE project.
Pumps and motors of the pumping station under the canopyOn site
05 · Water

Center-pivot infrastructure

The infrastructure and connections that center-pivot machines need.

Completed work

  • Center-pivot infrastructure on the Kenana, Al-Islah, Solaf and Al-Bustan farms.
  • Nelson units installed on center-pivot machines on the El Dabaa project.
Center-pivot towers on prepared landIllustrative photo
06 · Water

Filter & treatment stations for irrigation

Filter stations and treatment units attached to irrigation networks.

Completed work

  • Network pumping station and filter station for Al-Yaqeen Farm.
  • Intake basin, drip irrigation network and filter station for the Agrina project.
A real photo of a 2H filter station will be added here.
07 · Execution

Civil works

Digging and lining storage basins, building outfalls and the lift basins beside them, and concrete and structural works for stations and facilities.

Completed work

  • The main 100,000 m³ storage basin and outfalls for Al-Yaqeen Farm.
  • Water storage basins for the Kenana and Al-Islah farms.
A lined storage basin next to a pump unitOn site
08 · Execution

Mechanical works

Installing and commissioning pipes, valves and mechanical equipment.

Completed work

  • Fertigation units supplied and installed on the 400,000-feddan and 300,000-feddan projects in El Dabaa.
  • Booster works on the El Dabaa project, under a subcontract with El Shorouk Contracting.
Pipes and valves of a pumping station at the edge of the basinOn site
Illustrative photo
Contact us

Have land that needs preparing? We start with a site visit.

Call us or send the details of your project, and our team will get back to you.

WhatsApp