General contracting · Land reclamation · Water & irrigation networks

Building the infrastructure for the future of farming

From raw land to water and irrigation networks, pumping stations, and civil and mechanical works — delivered directly, from digging the main line to commissioning and handing over the network.

01About us

About 2H

We prepare the land, bring it water, and build what it needs to become productive.

2H is a general contractor specialising in land reclamation and agricultural infrastructure: from levelling and site preparation to water and irrigation networks, pumping stations, and the civil and mechanical works that go with them.

We work mainly on farms and projects in Ismailia and El Obour, alongside projects under the Mostakbal Misr Agency for Sustainable Development in El Dabaa, and irrigation-well and site works for the General Authority for the Suez Canal Economic Zone (SCZONE).

More about 2H
Planted center-pivot circles across a large tract of land, from above Illustrative photo
From desert to productive landReclaiming new land and preparing it for irrigation and farming.
04From our sites

Real footage from our work sites

Filmed on site: trenching for the lines, lining the basins, and pumping stations in operation.

On site
Water outfall into the storage basin
On site
Pumping station in operation
On site
Network pipes in the trench
On site
Digging trenches for the main line
On site
Lining the storage basin
On site
Excavating a storage basin and hauling soil
05Why 2H?

One contractor for the whole network

01

Integrated delivery

Civil, mechanical and water works under one management, from excavation to a running network.

02

Public and private clients

From private farms in Ismailia and El Obour to projects for the Mostakbal Misr Agency and the General Authority for the Suez Canal Economic Zone (SCZONE).

03

The full network

From the main line and pumps to center pivots, drip networks, filter stations and fertigation units.

04

Major reclamation projects

Work on national projects in El Dabaa, the Suez Canal Economic Zone and New Valley, alongside newly reclaimed farms in Ismailia.

06Our method

From raw land to productive land

A complete work cycle that most of our projects follow, from the first site visit to handing over a farm ready to run.

Cross-section — stage 1 Survey and design levels Levelling and trenching the line route Main line and pumping station installed Testing, commissioning and handover
Illustrative photo
Contact us

Have land that needs preparing? We start with a site visit.

Call us or send the details of your project, and our team will get back to you.

WhatsApp